The following information is what is required to apply for a Residential generator:
- A Building Permit Application (PDF) including:
- A survey indicating the location of the generator and compliance to section 355-15Q. Power generators, noise-producing equipment and aboveground fuel tanks. All power generators, noise-producing equipment and aboveground fuel tanks shall be subject to the following requirements, except for preexisting installations:
- Such equipment shall comply with all minimum setback requirements as applicable to accessory structures. (Half the distance of the required setback.)
- Such equipment shall not be permitted to be located within any front yard unless it is set back at least three times the distance required for a principal building.
- All such equipment shall be screened and fenced as required by the Building Inspector.
- "Exercise time" for such equipment shall be limited to weekdays between the hours of 9 am and 5 pm.
- The specification sheet of the generator and the manufactures recommendations of the proximity to a structure of the generator.
- Westchester County license, worker comp, liability, and disability, naming the Town of North Castle as certificate holder. (Workers comp. and disability cannot be on an accord form.)
- A Plumbing Permit Application (PDF) for the gas work. (If the propane company is not installing the gas line)
- An Electrical permit.