Planning Board Meeting
Submitted on September 26, 2019 - 4:52pm
Revised on September 26, 2019 - 4:52pm
Revised on September 26, 2019 - 5:05pm
Revised on September 26, 2019 - 6:07pm
Revised on October 4, 2019 - 9:37am
Revised on October 4, 2019 - 9:38am
Revised on October 4, 2019 - 2:19pm
Date:
Monday, October 7, 2019 - 7:00pm
NORTH CASTLE PLANNING BOARD
15 BEDFORD ROAD – COURT ROOM
7:00 p.m.
October 7, 2019
I. NEW AND CONTINUING BUSINESS:
A. GECAJ [18-025]
3 Vincent Lane
101.01-1-6
Residential Site Plan
James A. Ryan, RLA JMC Plan, Eng, Landscape Arch & Land Surveying,
Discussion of site walk
B. WAMPUS MILLS [14-103]
2, 3, 4, 5, 6 Shoemaker Lane & Cul-de-sac
Section 101.03, Block 02, Lots 7.2; 7.3; 7.4; 7.5; 7.6; 7.7(street)
Amended lot lines
Kory Salomone, Esq. The Law Office of Kory Salomone, PC
Ralph Alfonzetti, PE. Alfonzetti Engineering PC
Discussion
C. KESTON [19-034]
1 Shoemaker Lane
Section 101.03, Block 02, Lot 7.1
Site Plan
Ralph Alfonzetti, PE. Alfonzetti Engineering PC
Discussion
D. HASON [19-035]
2 Deer Ridge Lane
100.04-2-21
Residential Site Plan
Ralph Alfonzetti, PE. Alfonzetti Engineering PC
Discussion
E. SUNSHINE BUDDHA [19-020]
736 North Broadway
122.16-3-15
Amended Site Plan
Gabrielle Salman, AIA
Discussion
F. TURET [08-018]
East Lane, West Lane, Nichols Road
Final Subdivision, Tree Removal, Steep Slope and Wetlands Permit
108.03-3-36, 108.03-3-38, 114.01-1-4, 108.03-3-39, 114.01-1-5
Tim Allen, PE Bibbo Associates
Subdivision of an existing 8.28-acre lot into four residential building lots.
Consideration of Wetland Mitigation Bond
Consideration of Construction Performance Bond -Town Road & Drainage
Consideration of Construction Performance Bond - Common Drive & Drainage